Search
Amherst Drive
AmherstDrive remodelproject
Bathroom before
View of the master bathroom prior to the start of the project.
A master bathroom that was built in the late '80s and in need of repair. The grout had cracked and was missing in areas, allowing water to penetrate behind the tile.